Block 52 & 57
These two neighboring 6-story buildings required the removal of 169,000 yards of material, including 36,000 tons of contaminated material and 7,700 tons of structural back fill placed.
Each hole was 360’ x 120’ designed for 4 levels of below grade parking. From dewatering or dealing with contaminated soil to sensitive structural excavations and backfills, our ingenuity is matched only by our mindful strategic planning.